3D laser scanning gives piping designers measured, as-built data before they design a plant tie-in. This matters because old drawings are often wrong, and finding that out late costs more than most reports show. In a study of a contractor’s real project data, rework was under-reported by 300%. This article explains the three-step workflow Terra Drone Arabia (TDSA) uses, what piping designers receive, and when the method does not fit.
Key takeaways
- Scan the pipe racks and tie-in areas with handheld light detection and ranging (LiDAR), using the FJD Trion S2.
- Tie the scan to the plant grid with real-time kinematic (RTK) satellite positioning, using the FJD Trion V10i.
- Give the point cloud to piping designers for clash checks and isometric drawings.
Why Outdated Drawings Cause Problems at a Tie-In
A tie-in is the point where a new pipe connects to an existing pipe. Plant drawings fall behind after every repair, change and addition, so the drawing and the plant stop matching. Crews find the difference in the field, designers redraw the route, and pipe that was already ordered may not fit. Three numbers show what this can cost. All USD amounts are converted at SAR 3.75 per USD.
- Cost: rework is larger than reported
- What the source found: In January 2026, the American Society of Civil Engineers (ASCE) reported on a study that used a contractor’s real project data. Rework averaged 0.76% of contract value when post-completion fixes were counted, with a maximum of 7.34%. Without those fixes, the average was 0.38%, and the study found that rework was under-reported by 300%.
- What it means on a SAR 100 million (USD 26.7 million) tie-in package: At 0.76%, rework is about SAR 760,000 (USD 202,700). At 7.34%, it is about SAR 7.34 million (USD 1.96 million). This is our own calculation, not a result from the study.
- Limit of the data: The study covers general construction, not only brownfield work, so use it to judge scale.
- Time: one lost hour is expensive
- What the source found: ABB surveyed 3,600 senior decision-makers across 14 industries and published the results in October 2025. 83% said one hour of unplanned downtime costs at least SAR 37,500 (USD 10,000), and 76% said it can cost up to SAR 1,875,000 (USD 500,000). The average was SAR 637,084 (USD 169,889) per hour, and 7% of respondents reported more than SAR 1,875,000 (USD 500,000).
- What it means for a tie-in: A tie-in that waits while someone re-measures a pipe run uses shutdown hours.
- Limit of the data: The survey is not limited to refining. Read the numbers as the cost of a lost hour, not as a refinery average.
- People: maintenance work carries real risk
- What the source found: The International Association of Oil & Gas Producers (IOGP) published its 2025 safety data in June 2026. IOGP recorded 52 fatalities among its members, and the fatal accident rate rose 75% compared with 2024, even though work hours fell 7%. The most frequent causes are line-of-fire events, explosion, fire and burns, and falls from height, and maintenance is among the most frequent activities involved.
- What it means for a tie-in: IOGP did not study scanning. Our reasoning is simple: the less time people spend walking pipe racks with tape measures, the less time they spend near these hazards.
- Limit of the data: IOGP data covers its member companies in the oil and gas industry, not one plant.
These three numbers come from industry reports and news, not from TDSA projects, so we do not claim a saving of our own.
Demand for this work is rising. MEED reported on October 1, 2026 that Saudi Aramco is expected to start the main tendering for the Sasref expansion in the fourth quarter of 2026. The project adds steam crackers and integrates downstream derivative units into the existing Sasref complex, so it ties new units into an existing site.
How 3D Laser Scanning Works at a Tie-In
The workflow has three steps.

Step 1: Scan the area with handheld LiDAR. An operator walks through the pipe racks and the tie-in area carrying the FJD Trion S2. LiDAR measures distance with laser light, so the scanner records millions of points on pipes, steel and equipment. The scanner also uses simultaneous localization and mapping (SLAM) to build the map as the operator walks. This lets it work between pipes and under racks, where satellite signal is weak. The result is a point cloud: a 3D picture made of measured points.
Step 2: Set control to the plant grid. Next, we measure known points on site with the FJD Trion V10i. It uses RTK positioning from a global navigation satellite system (GNSS), a method that corrects satellite positions in real time to improve accuracy. These points tie the scan to the plant grid, the coordinate system your drawings use. Designers can then place the scan and the plant model on top of each other.
Step 3: Hand the point cloud to piping designers. The designers get the registered point cloud and use it for clash checks and isometrics, as the next section explains.
Limits to know. Satellite positioning needs a clear view of the sky, so control points are set where the signal is good. A scan also records only what the scanner can see. Pipe behind insulation, inside walls or underground is not measured by this method.
What Piping Designers Receive
At a refinery adding a new unit tie-in, an as-built scan reduces the field checks and rework that outdated drawings cause. A clash check tests whether new pipe would hit anything that already exists. An isometric is a 3D-style drawing of one pipe run, used to build it. Designers can do both from measured data instead of old drawings.

| Deliverable | What designers do with it | What it replaces |
| Point cloud in the plant grid | Check the new route against real pipe, steel and equipment before ordering material | Old drawings and tape measurements |
| Isometrics from measured geometry | Show each new pipe run as it will fit on site | Isometrics drawn from outdated drawings |
| CAD drawings (.DWG/.DXF) | Use the existing layout in the design package | Redrawing the layout by hand |
We deliver the data. Process design, greenfield front-end engineering design (FEED), fabrication and hot work are outside our scope and stay with your team and contractors.
Is 3D Laser Scanning Right for You?
It fits when:
- You are adding a tie-in or changing an existing pipe rack.
- The area is crowded and hard to measure by hand.
- You do not trust the current drawings.
- Your shutdown window is short and field re-measuring would use it up.
It does not fit when:
- The plant is new and there is nothing to measure yet (greenfield FEED).
- You need process design, fabrication or hot work.
- The pipe you need to measure is hidden behind insulation, inside walls or underground. Other methods are needed there.
What you provide: site access and permits, the latest drawing set, plant grid reference points, and a list of the tie-in points.
The same point cloud can later support a digital twin. This article covers tie-in design only.
Request a scan scope for your tie-in area. Email info@terra-drone.com.sa or visit terra-drone.com.sa.
FAQ
How long does 3D laser scanning of a tie-in area take? It depends on the size of the area, how crowded it is, and site access and permits. We give the scanning time in the quote once we know these.
How accurate is handheld LiDAR? We state the accuracy for each job and say whether it is vertical or horizontal. Accuracy depends on the scanner, the site and the control points.
Can you scan while the unit is running? Scanning does not touch the pipes. Whether it can be done in a live area depends on your site’s area classification, hot work rules and permit system, so your safety team decides.
What files do piping designers receive? They receive the point cloud in the plant grid and, if needed, CAD drawings (.DWG/.DXF).
Does scanning replace the design work? No. Scanning gives designers measured data. Design, FEED, fabrication and hot work stay with your team.