Weak construction monitoring is costly on large projects. McKinsey reviewed 300+ large projects, each worth SAR 3.75 billion or more. The average overrun was SAR 4.8 billion, which is 79% over the initial budget, and the average delay was about 18 months. This article shows one way to keep earthworks reporting on track using satellite imagery and RTK GNSS checks, with no drone flights needed. 

The monthly reporting gap

Every month, the project team needs one clear report. Earthworks sets the baseline for everything built after it. If that report is wrong, the error carries forward. The Construction Industry Institute puts rework at about 9% of total project cost. The GCC has seen the same pattern. On high-profile projects, rework has been linked to schedule delays of 10 to 20%. Cost escalation has reached up to 25% in some cases. many monthly reports rely on site walks or drone flights. Drone flights need permits. If a permit stalls, the data stalls. No data means no report.

Aerial view of earthworks on a large construction site for construction monitoring
Earthworks set the baseline for every stage that follows.

The satellite plus GNSS workflow

The workflow has three steps.

 

Step What happens  What you get 
1. Scheduled high-resolution satellite imagery  A site-wide record, no flight permit 
2. RTK GNSS spot checks  Ground truth for levels and volumes 
3. Terra Progress views [satellite support TBC]  Progress versus schedule 

 

Step 1: Scheduled satellite imagery

Satellites capture the whole site on a set schedule.

You don’t need to book a flight or wait for a permit. Update frequency depends on your needs, and monthly captures at 30 cm resolution are possible. See how it worked in practice: One Client, Three Sites: 12 Months of Sharp Satellite Imagery in Central-Western KSA 

Step 2: RTK GNSS spot checks

RTK GNSS is real-time kinematic positioning from satellites. A survey crew uses it to measure points on site.

These checks give ground truth for levels and volumes.

Imagery shows where work happened. The GNSS checks confirm the numbers.

Step 3: Progress versus schedule

Terra Progress puts the imagery and checked levels next to the schedule.

The views feed the monthly progress report and the claims records. [satellite support TBC]

Why fewer site walks matter

Construction is still a dangerous trade. In 2024, 1,034 US construction workers died on the job.

That’s a rate of 9.2 deaths per 100,000 full-time workers. Falls, slips and trips caused 389 of those deaths, about 38%. That data covers all construction, not only earthworks. Still, it shows what’s at stake on site. Spot checks put fewer people on active earthworks.

A worked example

Take a large infrastructure site with [X] hectares of earthworks.

  • Week 1: Satellite imagery is captured on schedule.
  • Week 2: A crew takes RTK GNSS checks at [N] points.
  • Week 3: The checked levels and imagery are loaded into the dashboard.
  • Week 4: The monthly report is built from the progress views.

No flight was needed at any point.

Surveyor taking an RTK GNSS measurement on an earthworks site
RTK GNSS spot check on siteRTK GNSS checks give ground truth for levels and volumes.

Is construction monitoring with satellites right for you?

It suits some projects better than others.

 

Good fit  Not a fit 
Large earthworks footprint  You need interior or MEP progress 
Flight permits are slow or restricted  You need contract administration 
Reporting runs on a monthly cycle  You need updates faster than the imagery schedule

Terra Progress tracks enabling works and earthworks.

It doesn’t cover interior or MEP progress. It doesn’t replace contract administration.

If your next report depends on a flight permit, a no-flight option is worth a look. Send your project inquiry to info@terra-drone.com.sa. 

Terra Progress dashboard showing earthworks progress against the schedule
One view shows where the work stands against the schedule.

FAQ

How accurate is satellite imagery for construction progress?

Imagery shows progress and change across the whole site.

Satellite imagery at 30 cm resolution provides the wide-area visual baseline (see the case study), while RTK GNSS checks supply the measured levels and volumes.

How often is the imagery updated?

Imagery is captured on a set monthly schedule.

Can satellite imagery measure earthwork volumes?

Imagery shows where work happened.

RTK GNSS spot checks give ground truth for levels and volumes.

Does this replace drones?

It’s a no-flight option for monthly reporting.

Drones can still help where permits allow.

Can the output support claims records?

Yes, the progress views feed the claims records.

They don’t replace contract administration.

What happens when clouds block the imagery?

water droplets scatter or absorb light, hiding the ground and casting dark shadows that create missing data or noisy measurements.

Table of Contents

Share This Article

Data you can trust, Operations you can scale

Ready to Transform Your Operations?

Latest Insights

Aerial drone view of Riyadh skyline in Saudi Arabia

Get the Drone & Geospatial Brief, Saudi Arabia

Real project breakdowns, GACA regulatory updates, and field-tested case studies from oil and gas, mining, and infrastructure operations. Used by engineering and procurement teams at Saudi Arabia’s largest operators. 

Joined by 2K+ industry professionals in Saudi Arabia.