{"id":7626,"date":"2026-06-23T11:24:31","date_gmt":"2026-06-23T08:24:31","guid":{"rendered":"https:\/\/terra-drone.com.sa\/?post_type=case-study&#038;p=7626"},"modified":"2026-06-23T11:24:31","modified_gmt":"2026-06-23T08:24:31","slug":"surveying-44-km-for-madinas-power-expansion","status":"publish","type":"case-study","link":"https:\/\/terra-drone.com.sa\/ar\/case-study\/surveying-44-km-for-madinas-power-expansion\/","title":{"rendered":"Surveying 44 Km for Madina\u2019s Power Expansion"},"content":{"rendered":"<h2><b>Project Profile Summary<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">This industrial engineering project was successfully proposed and planned for the client Al Fanar Projects in Madina, Kingdom of Saudi Arabia (KSA).<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The official techno-commercial proposal was finalized on December 29, 2024, under the Power Utilities and Grid Infrastructure sector.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The total field schedule and data processing window was completed within a strict timeline of 15 working days under favorable weather conditions.<\/span><\/p>\n<h2><b>\u0646\u0638\u0631\u0629 \u0639\u0627\u0645\u0629 \u0639\u0644\u0649 \u0627\u0644\u0645\u0634\u0631\u0648\u0639<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">We took on the assignment to map out a long and narrow strip of land for Al Fanar Projects in Madina, KSA.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The main objective of this assignment was to gather highly accurate ground elevation and asset data for a new 110 kV double-circuit overhead and underground power line.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The field mapping work covered a total survey distance of 44 kilometers long with a Right of Way width of 34 meters wide.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">By surveying this massive pathway, the team provided the core layout maps that construction crews needed to build the electrical grid safely and without errors.<\/span><\/p>\n<h2><b>Tools and Field Devices Handled<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">To complete this work without relying on flying drones, the field team successfully handled a variety of high-precision ground measurement devices.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The team operated 4 high-precision satellite GPS and GNSS devices to communicate with global networks and calculate exact ground spots down to the centimeter.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For areas with crossing wires and tall towers, the crew utilized 1 high-precision Total Station to measure exact three-dimensional angles and physical distances.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The team also deployed 1 Ground Penetrating Radar (GPR) to safely scan and identify items located directly underneath the dirt surface.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">All collected field data was checked right on the site using field laptops and tablets running specialized surveying software.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The entire operational crew, which consisted of 4 professional surveyors and 1 helper, was fully outfitted with standard safety kits including helmets, bright high-visibility vests, and heavy-duty safety boots while traveling across the route in 2 dedicated field cars.<\/span><\/p>\n<h2><b>Core Responsibilities and Technical Execution<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The daily operations were divided into clear technical tasks to ensure complete accuracy along the transmission line.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The first phase involved setting up a secure ground control network in accessible zones to anchor all upcoming survey points.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The crew utilized official reference points provided by the Saudi Electricity Company (SEC) as the primary baseline for the route mapping.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Once the baseline was fixed, the team walked the route to capture ground elevation data points at strict 25&#215;25 meter grid intervals.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">During this walkthrough, the surveyors located and documented every natural and man-made obstacle within the Right of Way, including intersecting overhead lines, light poles, and telecom towers.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The final operational phase focused on building and measuring physical guideposts.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The team constructed 5 Permanent Reference Monuments (PRMs) spaced exactly every 10 kilometers along the route.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Each monument was made using a 3-inch PVC pipe filled with concrete, standing 60 centimeters high above the ground and buried 40 centimeters deep for long-term hold.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The team measured these permanent monuments using static satellite observation to ensure all mathematical errors were removed.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Additionally, the team installed 45 Survey Benchmarks (BMs) every 1 kilometer or at every major path turn along the route.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">These benchmarks consisted of metal sticks set securely into the concrete or asphalt and were measured using fast Real-Time Kinematic (RTK) satellite observation referenced back to the nearest permanent monuments.<\/span><\/p>\n<h2><b>Engineering Deliverables<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">At the end of the 15-day timeline, all raw data points were fully processed and formatted into standard engineering files for the client&#8217;s design team.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The first set of files consisted of clean CSV text files which provided structured data tables showing exact point numbers and descriptions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The second output included XYZ files which displayed the plain text geospatial point coordinates for every mapped area, clearly listing the longitude, latitude, and elevation values.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Finally, the crew converted the entire land map into 3D digital CAD blueprints which allowed the construction engineers to load the data straight into their building platforms.<\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>Project Profile Summary This industrial engineering project was successfully proposed and planned for the client Al Fanar Projects in Madina, Kingdom of Saudi Arabia (KSA). The official techno-commercial proposal was finalized on December 29, 2024, under the Power Utilities and Grid Infrastructure sector. The total field schedule and data processing window was completed within a [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":7627,"template":"","meta":{"_acf_changed":false},"categories":[151,115,154,158,150,152,156,57],"tags":[],"class_list":["post-7626","case-study","type-case-study","status-publish","has-post-thumbnail","hentry","category-application","category-construction-infrastructure","category-geospatial-solution","category-gis","category-industry-vertical","category-solution-type","category-survey-mapping","category-utilities-power-generation"],"acf":[],"_links":{"self":[{"href":"https:\/\/terra-drone.com.sa\/ar\/wp-json\/wp\/v2\/case-study\/7626","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/terra-drone.com.sa\/ar\/wp-json\/wp\/v2\/case-study"}],"about":[{"href":"https:\/\/terra-drone.com.sa\/ar\/wp-json\/wp\/v2\/types\/case-study"}],"author":[{"embeddable":true,"href":"https:\/\/terra-drone.com.sa\/ar\/wp-json\/wp\/v2\/users\/4"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/terra-drone.com.sa\/ar\/wp-json\/wp\/v2\/media\/7627"}],"wp:attachment":[{"href":"https:\/\/terra-drone.com.sa\/ar\/wp-json\/wp\/v2\/media?parent=7626"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/terra-drone.com.sa\/ar\/wp-json\/wp\/v2\/categories?post=7626"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/terra-drone.com.sa\/ar\/wp-json\/wp\/v2\/tags?post=7626"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}